1.1m Width 6 Mil Vapor Barrier Film 500sqft/Roll Black Polyethylene

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | 6 Mil Black Polyethylene Film Vapor Barrier Underlayment | Material | LDPE |
---|---|---|---|
Thickness | 0.06 Mil | Color | BLACK |
Size | 500 Sqft/roll | Roll Width | 1.1m |
Application | Subflooring | Function | Waterproofing Membrane |
Highlight | 6 Mil Vapor Barrier Film,1.1m width Vapor Barrier Film,500sqft/roll black polyethylene film |
6 Mil Black Polyethylene Film Vapor Barrier Underlayment For Moisture Proofing
Introduction:
- Moisture Barrier is a low density Polyethylene film that can be used during the installation process with floating laminate and engineered wood floors. No need to bother with large fold-out, low quality, off-spec, construction grade films, which are bothersome and hard to use before the floor is installed.
Made with 100% polyethylene for long-lasting moisture protection
Designed for use over most types of subfloors
Helps protect wood or laminate floor from harmful subsurface moisture
Covers 100 sq. ft.; roll measures 40 ft. x 30 in.
Roll the film out and tape all seams for easy installation
Description | PE flim | |||||
Color | Black | |||||
Covering size | 500 sqft/roll | |||||
Thickness | 0.15 mm | |||||
Application | subfloor |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.