0.06mm Thickness Vapor Barrier Film SGS PE Moisture Barrier Film

Place of Origin China
Brand Name No Brand
Certification SGS
Model Number PE-6
Minimum Order Quantity 1000 sqm
Price Negotiable
Packaging Details packed with shrink wrapped
Delivery Time 12WORKING DAYS
Payment Terms T/T
Supply Ability 1 million sqm per week

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Material LDPE Thickness 0.06 Mm
Color BLACK Size 500 Sqft/roll
Roll Width 1.1m Application Subflooring
Function Vapor Barrie Feature Durable, Easy Installation
Highlight

0.06mm thickness Vapor Barrier Film

,

Vapor Barrier Film For Subflooring flooring

,

SGS pe moisture barrier film

Leave a Message
Product Description

6 Mil Black PE Film Vapor Barrier For Subflooring

 

Introduction:

  • Polyethylene sheet and film are used for many different construction and DIY projects. Some common applications for this product include using it as a vapor barrier for concrete or between drywall and insulation. They also can be used to cover a crawl space or under wood floors. Plastic sheeting is waterproof. Widely used for building site protection and moisture control.
Description PE flim
Color Black
Covering size 500 sqft/roll
Thickness 0.06 mm
Application subfloor

 

0.06mm Thickness Vapor Barrier Film SGS PE Moisture Barrier Film 0

 

How to Install

Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.

Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.

Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.

Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.

Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.

Step 6: Cut Section
Cut the next section of underlayment.