2mm Laminate Floor Underlay Noise Reduction Blue Foam Underlayment With PE Film

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | 2mm Blue EPE Laminate Floor Underlay | Material | EPE Foam |
---|---|---|---|
Thickness | 2mm Thickness | Density | 20kg/m3 |
Color | Blue | Size | 200sqft |
Application | Laminate Flooring | Feature | Sound Reduction, Moisture Proofing |
Highlight | 2mm Laminate Floor Underlay,EPE Laminate Floor Underlay With PE Film,Noise Reduction blue foam underlayment |
2mm Blue EPE Foam With PE Film Laminate Floor Underlay For Noise Reduction
Introduction:
2 mm Thick EPE Flooring Underlayment Padding with Tape & Vapor Barrier 3 in 1 Heavy Duty Foam
Features:
Mold and moisture protection, non allergenic, 2mm closed foam technology for sound reduction
Anti-crush technology for excellent performance & long life;
Perfect for wood, Bamboo and laminate floors easy installation with self adhesive strip
Blue underlayment padding with tape & vapor barrier 3-in-1 heavy duty foam
Easy installation with overlap and adhesive strip
Roll Cover: | 18.6m2 |
Roll Width: | 1100mm |
Roll Overlap | 100mm |
Thickness | 2mm |
Moisture Resistance Foil | blue PE film |
Material: | EPE |
Antimicrobial: | No |
Moisture Resistant | Yes |
Cushioning: | Yes |
Commercial / Residential: | Residential |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.