PE Film Underfloor Heating Underlay 200sqft / Roll Sound Reduction Green Foam

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | IXPE | Thickness | 2mm |
---|---|---|---|
Density | 33kg/m3 | Foaming Times | 30 |
Color | Green | Size | 200sqft/roll |
Application | Floating Floor, Floor Heating System | Advantage | Noise Reduction |
Highlight | PE film Underfloor Heating Underlay,200sqft/roll Underfloor Heating Underlay,Sound Reduction green foam underlay |
2mm Orange IXPE Foam With Holes For Floating Floor And Flooring Heating System
2mm Green IXPE With Holes and PE filmFor Flooring Heating System Sound Reduction
Introduction:
IXPE with holes is specialized for flooring heating system, with scientific holes to transmit the heat evenly and reduce energy wastage to work more efficient.
Suitable area:
Floor heating system, Laminate floor, wood floor, engineered floor, hardwood floor, floating floor, sub-floors, etc.
Roll Cover: | 18.6m2 |
Roll Width: | 1100mm |
Roll Overlap | 100mm |
Thickness | 2mm |
Moisture Resistance Foil | PE film |
Material: | IXPE |
Antimicrobial: | No |
Moisture Resistant | Yes |
Cushioning: | Yes |
Commercial / Residential: | Residential |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.