2mm Thickness Natural Rubber Floor Underlayment Green Vapour Barrier Underlay

Place of Origin China
Brand Name No Brand
Certification SGS
Model Number RUB 20-A
Minimum Order Quantity 1000 sqm
Price Negotiable
Packaging Details packed with shrink wrapped
Delivery Time 12WORKING DAYS
Payment Terms T/T
Supply Ability 1 million sqm per week

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Material Rubber Thickness 2mm
Density 970kg/m3 Color Green
Coating Aluminum Film Application Floating Floor, Floor Heating System
Highlight

2mm thickness Rubber Floor Underlayment

,

Natural Rubber Floor Underlayment

,

green vapour barrier underlay

Leave a Message
Product Description

2mm Green IXPE Foam With PE Film For Laminate Floor Noise Reduction

 

Introduction:

  • Natural rubber with integrated backing and aluminium vapour barrier
  • Prolongs the serviceable life of any floor covering
  • Prevents overstraining of the floor boards
  • Excellent impact sound insulation - 21dB
  • Footfall sound improvement - reduction by up to 20%
  • Permanent pressure resistance - 2KN/m² - 5KN/m²
  • Thermal Resistance (R-Value) - 0.16 m²/K/W
  • Tog Value - 1.6



Suitable area:
Laminate floor, wood floor, engineered floor, hardwood floor, floating floor, sub-floors, etc.

2mm Thickness Natural Rubber Floor Underlayment Green Vapour Barrier Underlay 0

 

Roll Cover: 10m2
Roll Width: 1000mm
Roll Overlap N/A
Thickness 2mm
Moisture Resistance Foil aluminum film
Material: Rubber
Antimicrobial: No
Moisture Resistant Yes
Cushioning: Yes
Commercial / Residential: Residential

 

How to Install

Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.

Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.

Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.

Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.

Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.

Step 6: Cut Section
Cut the next section of underlayment.