Sound Absorptio 2mm Thick IXPE Foam Underlay Green Underlay For Laminate

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | IXPE | Thickness | 2mm |
---|---|---|---|
Density | 67kg/m3 | Color | Green |
Coating | PE Film | Application | Floating Floor, Floor Heating System |
Highlight | 2mm thickness IXPE Foam Underlay,sound absorption IXPE Foam Underlay,67kg/m3 green underlay for laminate |
2mm Green IXPE Foam With PE Film For Laminate Floor Noise Reduction
Introduction:
IXPE Foam Underlayment is designed for using under floated laminate, bamboo and engineered wood floors and is ideal for many types of subflooring. This underlayment is with a 2 mm thickness foam layer that provides optimal cushioning, sound absorption, non allergenic, mold and moisture resistant, and premium closed cell structure underlayment with attached moisture barrier. It also coordinates the comfort with your floorings.
Suitable area:
Laminate floor, wood floor, engineered floor, hardwood floor, floating floor, sub-floors, etc.
Roll Cover: | 18.6m2 |
Roll Width: | 1100mm |
Roll Overlap | 100mm |
Thickness | 2mm |
Moisture Resistance Foil | PE film |
Material: | IXPE |
Antimicrobial: | No |
Moisture Resistant | Yes |
Cushioning: | Yes |
Commercial / Residential: | Residential |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.